A Bradford company - serving East Los Angeles, CA
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood

Cabinet Installation & Refacing in East Los Angeles, CA

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in East Los Angeles
New painted shaker cabinets with an organized deep drawer
A small remodeled galley kitchen with cabinets to the ceiling
A walk-in pantry with wood shelving
A remodeled kitchen with a waterfall island and wood cabinets
An open kitchen and dining area after a remodel
An open living space after a whole-home remodel
A finished backyard cottage with a small covered porch
A remodeled primary bathroom with a soaking tub and walk-in shower
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Cabinet Installation & Refacing in East Los Angeles, CA

Cabinet refacing in East Los Angeles typically costs $3,200 to $8,500 per kitchen, while full cabinet installation runs $6,500 to $16,000 depending on layout, box quality, and whether you’re changing the footprint. Both are done in stages, with a written price before any work starts and all completed work backed by the 365-Day Done Right Promise. If you’re weighing a cabinet job against a full remodel, the first call is to settle the scope; reach us at (833) 520-6636 and a live person will pick up.

What sets cabinet work apart from other trades is how unforgiving the geometry is. A single sixteenth of an inch out of plumb on the frame, and every door below it drags or gaps. In the older housing stock around East Los Angeles, particularly the 1920s-through-1950s bungalos and duplexes between Whittier Boulevard and Brooklyn Avenue, walls are rarely square and openings rarely level. Our technicians, with up to 22 years of experience, spend the first part of every job measuring, checking for furred-out studs, and confirming the substrate before a single box comes off the crate. That is why we need to see the kitchen before quoting it; you can see the parent scope in our Kitchen Remodeling work.

When the goal is a new look without pulling the whole room apart, refacing, replacing the cabinet fronts, drawer faces, hardware, and veneer over the existing box while keeping the layout, is what most homeowners ask for first. When the layout needs to change or the boxes are beyond saving, installation replaces them. Either way, you get a written price before any work starts, a background-checked, uniformed technician on the job, and a live person reachable 24/7.

Key Takeaways

  • Refacing in East Los Angeles runs $3,200 to $8,500 per kitchen; full replacement runs $6,500 to $16,000.
  • We quote in writing before any work starts; the number doesn’t move at the door.
  • Shaker, flat-slab, and raised-panel fronts are available through KraftMaid and Wellborn, with counter edges handled through Caesarstone and Silestone.
  • Every cabinet job carries a written 365-Day Done Right Promise.
  • The first step is a walkthrough; call (833) 520-6636 and a live person answers.
Installers leveling a new base cabinet during a kitchen remodel

When You Need Cabinet Installation & Refacing

Cabinet work tends to announce itself. The signs below are the ones we see most across East Los Angeles, from multi-generational homes near Belvedere Park to smaller kitchens in the flats around Rowan Avenue.

  • Doors that won’t sit flush. When cabinet doors sag, rattle, or bind against each other, the hinges have given way or the box has shifted. In homes built before the 1960s around East Los Angeles, settling foundations are a common cause, and the right answer is often to reset the frame before rehanging a single door.
  • The kitchen has outgrown the layout. Older East Los Angeles kitchens were built for a narrower flow of traffic and less counter space. If you can’t open the oven and the drawer at the same time, replacing the cabinet layout with a deeper or reconfigured run is the real fix.
  • Water damage visible under the sink. A swollen cabinet floor or a soft toe-kick means water has been at the substrate. Refacing over wet plywood won’t hold. The damaged unit gets replaced and the source of the moisture fixed first.
  • Peeling or failing thermofoil fronts. The cabinets installed in the 1980s and 1990s often have a laminate or thermofoil skin that peels off its substrate at the edges. Refacing with a solid wood or premium veneer front cures it.
  • A sale or rental turnover. When a property in East Los Angeles is changing hands and you need the kitchen to read as solid and complete, refacing is the fastest way to update it without touching the drywall.
  • The countertops need to come off anyway. If you’re installing new stone or quartz, that’s the moment to bring in new cabinet boxes; the counter can be installed on refacing fronts, but only if the existing boxes and substrate are sound.

Our Cabinet Installation & Refacing Process

  1. Walkthrough and written scope. We look at the existing cabinet boxes, check the frame and the substrate, measure the room, and write down what the job covers, what materials are specified, and what it will cost. You get the number in writing before any work starts. Nothing moves at the door.
  2. Layout and material confirmation. For installation, we confirm the layout on the plan: base run, wall run, spacing around the range and the sink, and the rough-in for the plumbing and electrical. For refacing, we confirm the cabinet box will hold the new doors, verify door and drawer-face dimensions, and settle the hardware. Cabinet brands like KraftMaid and Wellborn come with factory finish specifications and manufacturer warranty; your program is documented against those.
  3. Protection and demolition. We protect floors and counters, shut off the gas if a range is involved, and take out the old boxes cleanly. Salvageable hardware is set aside; anything with water damage or delamination is disposed of.
  4. Frame, level, and install. We shim, plumb, and square the frame, set the boxes, and verify level across the full run before installing the doors and drawer fronts. Counter edges and sink cutouts are done to spec; when Kohler sinks are involved, the plumbing rough-in is coordinated before the counter goes down.
  5. Doors, drawers, and finish. Hinges, slides, and pull hardware are set and adjusted. Doors are checked for clearance against one another and against the counter, and the reveal lines are squared.
  6. Job close and written guarantee. We sweep the room, remove debris, walk the finished job with you, and hand over the signed 365-Day Done Right Promise. If the work fails inside that window, we come back and make it right at no charge. That’s the standard.
A second-story addition that matches the existing roofline

Cabinet Installation & Refacing Pricing in East Los Angeles

Refacing runs $3,200 to $8,500 for a typical East Los Angeles kitchen; full installation runs $6,500 to $16,000. The low end is a smaller kitchen with a limited door count and solid existing boxes. The high end is a kitchen with a changed footprint, new counter, and full box replacement. Every price is written down before work starts.

Scope Typical Price Range (East Los Angeles)
Refacing, doors and drawer fronts only $3,200 – $5,500
Refacing plus new counter (Silestone or Caesarstone edge) $5,000 – $8,500
Full cabinet box replacement, no layout change $6,500 – $11,000
Full replacement with layout change and new counter $11,000 – $16,000

What moves the number:

  • Scope. Doors and fronts cost less than boxes. Boxes cost less than a changed layout.
  • Cabinet line. KraftMaid and Wellborn both have stepped lines; the finish, door style, and box construction determine the cost.
  • Counter. If you’re adding stone, the material and edge profile drive the price. Silestone and Caesarstone both run higher than a laminate, and the cabinet job has to be ready for the counter before it’s templated.
  • Plumbing and electrical. Moving a sink, adding a dishwasher circuit, or relocating a gas range is extra work that has to be coordinated before the cabinets go in.
  • Wall and floor conditions. A bowed wall or an unlevel floor behind the box adds time to shim and square the run.

Refacing saves you the cost of new boxes and the disruption of tearing out drywall around them; installation gives you a new layout and new construction. Which is right for your kitchen comes down to the condition of the boxes, not the budget. For a broader look at how cabinets sit inside a full remodel, see Kitchen Remodeling in East Los Angeles. If you’re ready to price the cabinet scope, call (833) 520-6636 for a free estimate.

FAQs – Cabinet Installation & Refacing

How much does cabinet refacing cost in East Los Angeles?

Cabinet refacing in East Los Angeles runs $3,200 to $8,500 for a typical kitchen, depending on door count, material, and whether a new counter is included. The low end covers a smaller kitchen with solid existing boxes; the high end adds a new stone counter and more door and drawer faces. Call (833) 520-6636 and we’ll give you an exact quote in writing – estimates are free.

Is it cheaper to reface or replace cabinets?

Refacing costs less than full replacement, typically 40 to 55 percent less for a comparable door style. Refacing is the better choice when the existing boxes are solid and the layout is not changing. Replacement is the right answer when the layout needs to change, the boxes are water-damaged, or the substrate is failing. We’ll tell you plainly which one applies to your kitchen before quoting.

Can you reface cabinets over water damage?

No. Refacing over a swollen cabinet floor or a soft toe-kick traps the damage and will fail inside a year. Any cabinet with visible water damage or delamination is replaced as part of the scope, and the source of the moisture is addressed before new fronts go on. That’s what the 365-Day Done Right Promise is there for: if the work fails inside the year, we return and correct it at no charge.

How long does a cabinet job take in East Los Angeles?

A refacing job typically takes 4 to 6 working days in a typical East Los Angeles kitchen; full replacement with counter takes 10 to 15 days once materials are on site. The timeline depends on the number of cabinets, whether the layout changes, and how the counter template and install is scheduled around it. We schedule the work in stages and confirm dates in writing before any tools come out.

Can you come today?

We can often schedule a walkthrough the same week, and we answer the phone with a live person 24/7 – not a voicemail, not a callback queue. For active leaks or a failed cabinet that’s blocking use of the kitchen, tell us when you call and we’ll prioritize the walkthrough. Call (833) 520-6636.

Whether you’re refacing a 1970s kitchen in the flats or installing new boxes in a bungalow near Belvedere Park, the first step is a walkthrough: we look at the boxes, measure the room, and put the scope and the price in writing before any work starts. Call (833) 520-6636 for a free estimate. Our team will confirm what the 365-Day Done Right Promise covers, up to 22 years of technician experience is on every job, and you’ll have a live person on the line today.

For the full picture of how cabinets fit into a bigger remodel, start with the parent service page on home or read more here: Kitchen Remodeling in East Los Angeles. If you’re also planning counters and plumbing, our guides on countertops in East Los Angeles and kitchen plumbing in East Los Angeles cover what’s involved. Homeowners near Boyle Heights, Lincoln Heights, and Whittier have the same questions; the process is the same. And for a broader view of general contracting, see our general contracting in East Los Angeles page. For whole-home scope, start with whole-home remodeling in East Los Angeles.

Written by the team at Bradford Remodeling Co East Los Angeles, serving East Los Angeles.

Getting started with Bradford in East Los Angeles

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your East Los Angeles team

A local vetted partner works across East Los Angeles and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in East Los Angeles? Licensed & insured · free written estimates
Call (833) 520-6636
Local Service Coverage

Request a Free Estimate in East Los Angeles

Tell us what you need - Bradford Remodeling Co East Los Angeles responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch