







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
IKO Home Additions & ADU: The East Los Angeles Owner’s Guide
IKO-compatible home additions and ADUs in East Los Angeles typically run $53,100 – $153,400 for a home addition and $106,200 – $259,600 for a detached ADU, priced in a written line-item quote before any work starts. A garage conversion is the lowest-cost path to a legal second unit at $35,400 – $94,400. If you’re here because an enclave is leaking, a flat roof is ponding, or an addition’s tie-in has pulled away from the main house, those are the three failures we see most on IKO-weatherproofed structures in this part of the city.
Key Takeaways
- Installed pricing for East Los Angeles, not a national average: additions $53,100 – $153,400, ADUs $106,200 – $259,600, garage conversions $35,400 – $94,400.
- IKO failed parts are almost always in the roof-to-wall tie-in or on a low-slope section over the new footprint, not the shingle field itself.
- We’re an independent contractor. We’re not affiliated with IKO. We match IKO-compatible materials to your existing assembly and document it.
- Every project gets a written price before work begins and the 365-Day Done Right Promise on the finished job.
Which IKO Models This Applies To

IKO’s residential line spans several product families, and what matters for an addition or ADU is how the new roof meets the old one. If your main house carries IKO Cambridge or Dynasty laminated shingles, the new addition’s flat or low-slope sections typically call for a modified bitumen membrane (IKO’s Torch-Flex or similar) rather than shingles – the pitch can’t take shingles without a costly build-up. That membrane-to-shingle transition is where the failure usually starts.
Identify your existing roof by the shingle wrapper left with your permit file (East Los Angeles jobs pull permits, so the paperwork exists), or by a physical check: Dynasty runs roughly 12-inch exposure with a wider nailing zone than Cambridge; the tear-off edge tells you which. For aftermarket, a comparable modified membrane from CertainTeed or Owens Corning performs the same job – the OEM question is really about warranty continuity, not fit. Measure the existing slope and layer count before you decide, since a two-layer tear-off on an addition in East Los Angeles costs about 30% more in labor than a single-layer overlay.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your IKO Home Additions & ADU Is Failing
- Ponding water on the low-slope section – flat membrane areas over an addition need adequate pitch; standing water past 48 hours after rain points to a slope or drain problem, and over the years that eats the membrane from underneath.
- A damp seam at the roofline tie-in – where the addition’s flat roof meets the main house’s shingle slope, the flashing is the weak point; a dark stain on the interior ceiling near that wall is the early tell.
- Bubbling or rippling membrane – trapped moisture or a poor application in the original install; in East Los Angeles heat the bubbles can open into a split within a season.
- Interior cracking at the wall junction – a stair-step crack where the addition meets the original structure can signal ground movement or a missing expansion joint, which is a structural question, not a surface one.
- Water behind the stucco at the addition face – East Los Angeles’s stucco over IKO-wrapped sheathing can trap moisture if the weather-resistive barrier wasn’t lapped correctly; bubbling stucco or a musty smell inside is the cue to open a test area.
Replacement Cost & What’s Included

Every number below is a written, line-item price before work starts, so nothing moves at the door.
| Scope | Installed range (East Los Angeles) |
|---|---|
| Home addition | $53,100 – $153,400 |
| ADU construction | $106,200 – $259,600 |
| Garage conversion | $35,400 – $94,400 |
What moves the range: square footage, foundation condition on East Los Angeles’s older lots, whether utilities are PEX or copper, roof system choice on the new footprint, and how much of the existing structure gets repaired at the tie-in. Materials are documented – KraftMaid or Wellborn cabinetry in a kitchen portion, Cambria or Silestone surfaces, GAF or James Hardie exterior components – so specs are traceable. The finished work carries the 365-Day Done Right Promise: if it fails within a year of completion, we return and correct it at no charge.
See the difference
Before
After
Before
After
Before
AfterDIY or Call Us?
What you can safely do: document the problem. Photograph ponding water, the tie-in seam, and any interior staining; check the permit file for the original roof product; and record where the water appears after a rain. That saves everyone time and proves nothing is cosmetic.
What we tell homeowners not to attempt is the roof-to-wall flashing and any tear-off above the first floor. Opening a tie-in exposes the interior structure to water until it’s closed correctly, and a bad repair on a low-slope membrane tends to fail silently for a full season before you see it. We’re not a parts shop and we don’t carry stock on the truck – we source the compatible membrane and flashing per job, so the material matches your assembly rather than whatever was handy. Call (833) 520-6636 to schedule your free estimate.
FAQs

A correctly installed modified membrane over a properly pitched low-slope section typically gives 15 – 20 years in Southern California, and shingles on the main slope will run 20 – 25 years. Heat and UV exposure in East Los Angeles shorten that if the membrane wasn’t applied to factory spec. Call (833) 520-6636 for a free inspection of what you actually have.
Often yes, if the failure is isolated to the flashing or a small membrane seam – a targeted repair runs a fraction of a rebuild. Once water has saturated the substrate, a repair is not enough and the assembly needs to come open. We’ll tell you which one you have in the written estimate.
A garage conversion usually takes the shortest path; a detached ADU runs longest, and a home addition falls between. East Los Angeles permit timelines and inspection scheduling drive the calendar as much as the build itself, so we build the schedule around them and put the dates in writing.
We identify your existing assembly first, then source the matching membrane, flashing, and underlayment from a documented product line so the spec is traceable. We don’t claim to stock parts – we order to spec. Call (833) 520-6636 for a free estimate.
Schedule Your Free Estimate
Give us a call at (833) 520-6636 and a live person answers, day or night. We’ll look at the failing assembly, put a line-item price in writing before any work starts, and stand behind the finished job with the 365-Day Done Right Promise. Bradford Remodeling Co East Los Angeles is an independent contractor serving East Los Angeles and the surrounding area, held to The Garrison Standard.
Written by the team at Bradford Remodeling Co East Los Angeles, serving East Los Angeles and nearby areas.












