







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
CGI Home Additions & ADU: The East Los Angeles Owner’s Guide
We build CGI-compatible home additions and ADUs in East Los Angeles, and a typical addition runs $53,100 – $153,400 installed, while a full ADU runs $106,200 – $259,600. We’re an independent contractor and not affiliated with CGI. The schedule question matters, so we’ll answer it straight: a planned addition or ADU is not a same-day job. A garage conversion sits at $35,400 – $94,400 and finishes in weeks, not hours, because we pull permits and pass inspections before anyone moves in. Owners usually call us after a previous crew disappeared mid-framing, after a “firm” quote grew at the door, or once they realize the detached structure has no legal path to a certificate of occupancy.
Which CGI Models This Applies To

CGI isn’t a single product line, so “the right part” starts with an honest question about what you actually have. Owners of a CGI-branded addition or accessory dwelling in East Los Angeles fall into two groups: those with a shell or modular component installed under a CGI spec sheet, and those whose original contractor used CGI-compatible framing, panels, and trim that were never documented properly. The first group has a paper trail. The second usually has a drawing set, a permit card, and a lot of guesses.
Identify what you have before anyone quotes a repair. Look for a data plate or stamped label on the structural panels, a manufacturer spec sheet in the permit file, and the recorded square footage on the Los Angeles County Assessor page. Measure the wall-to-wall span and note the ceiling height; those two numbers alone tell a qualified crew which CGI-compatible assembly you’re working with. Original permit drawings, if you can pull them, beat every guess.
The OEM-versus-aftermarket decision is real here. CGI-spec structural components carry manufacturer warranties that a generic substitute doesn’t, and mixing an aftermarket panel into a CGI assembly can void the coverage on the whole wall system. We match to the documented spec where it exists and tell you plainly when a quality equivalent is the smarter call. Our technicians have up to 22 years of experience reading these assemblies, and we work from a documented roster of premium brands – KraftMaid, Cambria, and Silestone among them – so anything we specify is traceable on paper.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your CGI Home Additions & ADU Is Failing
Structural and envelope problems in East Los Angeles rarely announce themselves. They build quietly until a rainy season or a permit inspector finds them. Watch for these five:
- Water staining on interior ceiling or wall panels. This means the roof-to-wall flashing or the envelope seal has failed, and water is tracking behind the finish. In East Los Angeles, the dry season hides it and the first real rain exposes it.
- Doors and windows that stick or won’t latch seasonally. That’s movement in the frame or the foundation, and in additions built on a slab it often traces to soil settlement or an undersized footing.
- Visible cracks at wall-to-ceiling joints or above door headers. Hairline cracks are normal settling; cracks that widen over months point to a structural or load-path problem that needs a professional assessment.
- Musty smell or soft drywall near the floor line. Moisture is trapped inside the assembly, usually from a failed vapor barrier or a grading issue that lets water pool against the foundation.
- No certificate of occupancy for the structure. An unpermitted or partially permitted addition is a functional failure, not a cosmetic one. It affects resale, insurance, and financing before it ever affects your comfort.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Here is what the work actually costs in East Los Angeles, with parts and labor folded into one written number you see before we start:
| Scope | Installed Price Range |
|---|---|
| Home Addition | $53,100 – $153,400 |
| ADU Construction | $106,200 – $259,600 |
| Garage Conversion | $35,400 – $94,400 |
What moves the number within those ranges: square footage, foundation type, whether the site already has utilities stubbed to it, permit and inspection fees, and the condition of the existing structure you’re tying into. A conversion of a sound garage sits at the low end. An addition on a slope with new electrical rough-in climbs toward the top. We put every line in writing before a single tool comes out, and we don’t reprice at the door. Every completed project carries the 365-Day Done Right Promise: if the work fails inside a full year, we come back and correct it at no charge.
DIY or Call Us?
Some of this you can check safely. You can look for the data plate, pull the permit file, photograph cracks with a date reference so you can see whether they’re moving, and check the grading around the foundation. Those are inspection tasks, and they help any crew quote you accurately.
Where DIY goes wrong: structural framing, load-path changes, electrical rough-in, and anything involving the gas line. Those aren’t weekend projects, and getting them wrong is a permit and safety failure that costs more to fix than to do right. We don’t hand out step-by-step framing instructions, and no responsible contractor should. The honest line is this: inspect what you can, then let a trained crew handle the structural and electrical work. Call (833) 520-6636 and we’ll look at what you have.
FAQs

How long does a CGI-compatible addition or ADU last in East Los Angeles? A properly built, permitted addition holds up for decades, and an ADU built to current code typically serves 30 to 50 years before major envelope work. The variable is water: East Los Angeles’s dry summers and sudden winter rain punish poor flashing and grading faster than anything else. Call (833) 520-6636 for a free estimate on your structure.
Can my failing addition be repaired instead of rebuilt? Often yes, and we’ll tell you when a repair is the right call rather than quoting a full replacement. A failed flashing detail, a cracked joint, or a grading problem is usually a repair. A footing or load-path failure is not, and no honest crew will patch over it. Call (833) 520-6636 and we’ll assess before we price.
How long does the actual work take? A garage conversion runs several weeks; a ground-up ADU takes months, because permits and inspections set the pace and nobody can compress that legally. We give you the schedule in writing before work starts, and we honor it. Call (833) 520-6636 for a free estimate with a real timeline.
How do you source materials for a CGI-spec structure? We work from the documented spec sheet and the permit drawings, and we specify from a roster of premium brands with manufacturer warranties behind them – KraftMaid, Cambria, and Silestone among others – so every material is traceable. Where an OEM component carries coverage an aftermarket substitute would void, we say so plainly. Call (833) 520-6636 to schedule your free estimate.
We’re the by-the-book crew for homeowners who’ve been burned by no-shows and surprise invoices. Every price is in writing before work starts, every technician is background-checked and uniformed, and a live person answers the phone around the clock. If the work fails within a year of completion, the 365-Day Done Right Promise puts us back on the job at no charge. Give us a call at (833) 520-6636 for a free estimate – we’ll look at your structure, quote it in writing, and tell you the truth about what it needs.
Written by the team at Bradford Remodeling Co East Los Angeles, serving East Los Angeles and nearby areas.












